With increasing fuel and raw materials costs, there has been a great need to improve efficiencies at existing plants. ITG has worked with a wide set of clients including both major Fortune 500 companies and smaller privately owned firms to provide the technical perspective needed to minimize long-term operational costs.

To view projects, click on the links below.
•   Caterpillar Distributed Heating System Design, Caterpillar Mining and Construction Equipment Division
•   Heavy-duty Truck Lube Facility, Speedco Truck Lube
•   Reliability/Productivity Improvement Assessments, Confidential Client
•   Packaging Line Improvements, Leading Producer of Specialty Packaging Products
•   CMMS Utilization, Confidential Client

 
 
 
 
 
 
 
 
 
 
 
 
 
(back to previous page)
©2007, Industrial Technology Group